Day 99, Blue floorboards

Day 99, Blue floorboards

Tuesday 27th September The big question of the day was whether the rowlock pins would come free from their glued up state wrapped in cling film and so the first thing I did was to give all 8 a good twist and confirmed they would all come free. Harry watched this process and then we…

Day 98, Holes in the boat

Day 98, Holes in the boat

Monday 26 September The Queen’s birthday holiday in WA today but the shed was open for business as usual. Not that there were many takers. JP and I were it, Mark was playing safe with Covid like symptoms. The day started with drilling holes in boat 1 for the bungs. JP made a trip over…

Day 93, Sanding both boats

Day 93, Sanding both boats

Thursday 15th September The intention today was to possibly glue in the first inwale batten on boat 2. When I arrived with the unopened box containing the glue sent from Boatcraft Pacific I was very disappointed to find that instead of Bote Cote E-Epoxy there was a two part pouring foam kit in the box….

Day 90, Resin coating 2

Day 90, Resin coating 2

Friday 9 September Another extra day in the shed for JP and I. We have set ourselves the task of having boat 1 weather proof for next Saturday so that we can display her at the Supa IGA during our sausage sizzle and raffle there in the morning. I want to have 3 coats of…